Location:detail
球友体育官网
Source:球友体育官网 Date:2018年11月28日

Started in 2006, Hangzhou Metro Line 2 is a part of the Hangzhou Metro network. CREC undertakes the overall survey and design services of 球友体育官网. CREC also provides construction services for Phase I Project of Hangzhou Metro Line 2, whose design length is 30 kilometers.

球友体育官网

 

Print Close