The total length of the line is 39.75 kilometers, of which the underground line is 球派体育app 31.18-kilometer-long, the elevated line is 球派体育app 8.12-kilometer-long, the ground line and the open section are 球派体育app 450-meter-long. It set 25 stations and the total investment of the project is 球派体育app 20 billion yuan.

Phase I Project of Chongqing Metro Line 5